Office Building Glass Light Wall Exterior Resistance Wind Curtain Wall
Product Details:
Place of Origin: | Zhejiang, China |
Brand Name: | Fasecbuildings |
Certification: | EN 1090-2-2018; ISO3834 |
Model Number: | Glass wall |
Payment & Shipping Terms:
Minimum Order Quantity: | 300 sqm |
---|---|
Packaging Details: | Seaworthy packing in container or bulk vessel |
Delivery Time: | Based on client's needs like one month |
Payment Terms: | L/C,T/T, D/A, D/P, Western Union |
Supply Ability: | 600,000 sqm per Year |
Detail Information |
|||
Specification: | Customized Exterior Glass Wall | Material: | Aluminum +Toughened Glass |
---|---|---|---|
Color: | Customized As Order | Installation: | Easy |
Size: | According To Client's Need | Application: | Commercial Building |
High Light: | Office Building Glass Light Wall,ISO3834 Glass Light Wall,Exterior Resistance Wind Curtain Wall |
Product Description
Aluminum Invisible Frame Office Building Glass Light Wall Resistance Wind Curtain Wall
Glass curtain wall construction technology
1. Process characteristics
1.1 The glass is fixed on the sub-frame with silicone structural sealant, and the sub-frame is fixed to the main frame (column, beam) by mechanical clamping. The structural glass assembly components are completely separated from the main frame, which is one of the biggest features of the hidden frame glass curtain wall component construction.
1.2 The structural glass assembly components are produced in a professional production workshop. The quality of the glue and the processing accuracy are guaranteed, and the silicone structural sealant is saved.
1.3 Columns and beams are cut by the manufacturer, with high processing accuracy and less material waste.
1.4 The key process of making structural glass assembly components is reduced on the construction site, the construction period is shortened, and the construction equipment is reduced.
1.5 Columns, beams, and glass plates are installed on site one by one, easy to install and easy to adjust.
1.6 The construction is simple, the process flow is clear and easy to understand, and the operator is easy to master, but it requires higher professional skills and overall planning ability of the manager.
2. Process flow
Construction preparation → measurement and setting out → embedded parts processing → connection angle installation → column installation → beam installation → structural glass assembly assembly production and installation → cleaning inspection → completion acceptance
3. Key points of construction operation
3.1 Construction preparation
3.1.1 Material preparation: According to the drawings and engineering conditions, prepare a detailed material ordering and supply plan.
3.1.2 Construction machinery: inspect the machinery used to ensure its good performance.
3.1.3 Personnel preparation: Provide technical training and confession to skilled workers.
3.1.4 Technical preparation: Be familiar with the drawings, and prepare the tables for the relevant atlases, quality acceptance standards and internal business data.
Performance Parameter | ||
Performance | EU-STD | GB/T7106 GB/T8484 |
Air Tightness | Class4 | Class8 |
Water Tightness | E1500 | Class6 |
Wind Resistance | C5 | Class9 |
Insulating Properties | K 1.45W/㎡·K | Class8 |
Sound Insulation | Rw=dB39 Glazing 5+12A+5+12A+5 |
Our Certification:
Performance Parameter | ||
Performance | EU-STD | GB/T7106 GB/T8484 |
Air Tightness | Class4 | Class8 |
Water Tightness | E1500 | Class6 |
Wind Resistance | C5 | Class9 |
Insulating Properties | K 1.45W/㎡·K | Class8 |
Sound Insulation | Rw=dB39 Glazing 5+12A+5+12A+5 |