Sound Insulation Glass Glazed Window Aluminum Glass Curtain Wall
Product Details:
Place of Origin: | Zhejiang, China |
Brand Name: | Fasecbuildings |
Certification: | EN 1090-2-2018; ISO3834 |
Model Number: | Glass wall |
Payment & Shipping Terms:
Minimum Order Quantity: | 300 sqm |
---|---|
Packaging Details: | Seaworthy packing in container or bulk vessel |
Delivery Time: | Based on client's needs like one month |
Payment Terms: | L/C,T/T, D/A, D/P, Western Union |
Supply Ability: | 600,000 sqm per Year |
Detail Information |
|||
Specification: | Customized Exterior Glass Wall | Material: | Aluminum +Toughened Glass |
---|---|---|---|
Color: | Customized As Order | Installation: | Easy |
Size: | According To Client's Need | Application: | Commercial Building |
High Light: | Sound Insulation Glass Glazed Window,Aluminum Toughened Glass Glazed Window,Exterior Aluminum Glass Curtain Wall |
Product Description
Manufacturers Customized Visible Invisible Frame Glazed Window Sound Insulation Aluminum Glass Curtain Wall
The structural glass assembly components are made in a professional production workshop, and the processing technology is as follows:
Aluminum frame assembly
After cutting the aluminum profile, it should be assembled on a special workbench. When mass producing aluminum frames, molds should be set on the workbench and assembled according to fixed molds to ensure the uniformity of aluminum frame assembly. The assembled aluminum frame should be checked for the following items: the difference in the size and length of the opposite sides of the aluminum frame; the difference in the diagonal length of the aluminum frame; the assembly gap between the aluminum materials; the flatness between adjacent aluminum materials.
Glass making
The glass is processed by the manufacturer as required and then sent to the aluminum frame assembly workshop.
purification
Purification is the most critical process in the production of structural glass assembly. Only by carefully purifying the surface of the substrate in accordance with the process requirements, can structural glass assembly components with specified reliability be manufactured. For oily stains, use xylene; for non-oily stains, use a mixed solvent of isopropyl alcohol and water. The purification method uses two rags: pour the solvent on a rag, wipe the surface of the substrate in one direction, and wipe the solvent that dissolves the stain with a clean rag before the solvent that dissolves the stain is not evaporated Clean (if this rag is dirty, replace it with a clean rag). Do not wipe after the solvent evaporates, because after the solvent evaporates, the stains still remain on the surface of the substrate, and a dry cloth cannot be wiped off.
Use non-marking and non-linting cotton cloth for the rag. At the same time, please note that the solvent can only be poured on the rag, and the rag should not be used to dip the solvent into the container to prevent the stained rag from contaminating the solvent. Glue is applied immediately within 30 minutes after purification, because if the residence time after purification is too long, the surface of the substrate will be contaminated by pollutants in the surrounding environment. At this time, the glue must be re-purified.
position
Positioning is to fix the glass on the specified position of the aluminum frame. Generally, a positioning fixture is used to ensure that the reference lines of the two coincide. On the positioning platform, a baffle with a height of about 100mm is set along a group of adjacent sides of the platform as a positioning reference for the glass. An aluminum frame positioning fixture is installed on the platform surface to fix the aluminum frame on the predetermined design position of the glass and aluminum frame. On the platform, stick the double-sided adhesive strip on the aluminum frame according to the design position, so that the glass will fall along the blocking plate, and the two baselines coincide.
The glass must be positioned successfully at one time, and the glass cannot be moved when the positioning is incorrect, because once the glass contacts the double-sided tape, the self-adhesive will stick to the glass. Applying structural adhesive on this layer of self-adhesive will not guarantee its adhesion to the glass. Connect firmly. After the glass is positioned, an empty web is formed with the glass and aluminum frame as the side wall and the cushion strip as the bottom. The size should be the same as the width and thickness of the glue joint.
Performance Parameter | ||
Performance | EU-STD | GB/T7106 GB/T8484 |
Air Tightness | Class4 | Class8 |
Water Tightness | E1500 | Class6 |
Wind Resistance | C5 | Class9 |
Insulating Properties | K 1.45W/㎡·K | Class8 |
Sound Insulation | Rw=dB39 Glazing 5+12A+5+12A+5 |
Our Certification:
Performance Parameter | ||
Performance | EU-STD | GB/T7106 GB/T8484 |
Air Tightness | Class4 | Class8 |
Water Tightness | E1500 | Class6 |
Wind Resistance | C5 | Class9 |
Insulating Properties | K 1.45W/㎡·K | Class8 |
Sound Insulation | Rw=dB39 Glazing 5+12A+5+12A+5 |